PRODUCTION CALENDAR
This Week
Mon
6
Tue
7
Wed
8
Thu
9
Fri
10
Sat
11
Sun
12
158. Pile prep
-
Short term 5B rev 5
April 2019 Ground Floor Production Lane
JPS
AWL
tsst
BVH
Another test
Hello
Yeet
?
Huh
FabT
?
Coool.
f
Test2
Test
Test
Apr 18, 2019
Went well
Remove by
Apr 24 2019
Removed
True
Assigned To
Sam Giddings (Hawkins)
Details
sss
Response
None
Remove by
Apr 24 2019
Removed
True
Assigned To
Sam Giddings (Hawkins)
Details
sss
Response
None
Sam Giddings (Hawkins) 30
1) Detail Cut | Basement: Grids 1-4/ A-C
Sam Giddings (Hawkins)
2) Crop Cap | Basement: Grids 1-4/ A-C
Brad Knewstubb (Mahi)
3) Reo Visual Inspection | Basement: Grids 1-4/ A-C
sss
Remove by
May 01 2019
Removed
False
Assigned To
Sam Giddings (Hawkins)
Details
blah
Response
None
Remove by
Apr 25 2019
Removed
False
Assigned To
George Hardie (Marin Construction)
Details
Test2222
Response
None
Remove by
May 01 2019
Removed
False
Assigned To
Sam Giddings (Hawkins)
Details
blah
Response
None
Remove by
Apr 25 2019
Removed
False
Assigned To
George Hardie (Marin Construction)
Details
Test2222
Response
None
Remove by
Apr 25 2019
Removed
True
Assigned To
Sam Giddings (Hawkins)
Details
12312312321
Response
None
Remove by
Apr 25 2019
Removed
False
Assigned To
Sam Giddings (Hawkins)
Details
12312312321
Response
None
Sam Giddings (Hawkins) 2
4) Install Pile Cap Cage | Basement: Grids 1-4/ A-C
a
Max Zuks (Hawkins) 1
6) Concrete Pour | Basement: Grids 1-4/ A-C
159. Membrane Ground Floor
May 06 2019
-
May 14 2019
Short term 5B rev 5
April 2019 Ground Floor Production Lane
Remove by
Removed
False
Assigned To
Jason Carnie (Hawkins Construction)
Details
None
Response
None
Remove by
Removed
False
Assigned To
Jason Carnie (Hawkins Construction)
Details
None
Response
None
Remove by
Removed
False
Assigned To
Jason Carnie (Hawkins Construction)
Details
None
Response
None
Remove by
Removed
False
Assigned To
Jason Carnie (Hawkins Construction)
Details
None
Response
None
Sam Giddings (Hawkins)
1. Sikadur pile cap | Basement: Grids 1-4/ A-C
2. Install Corflex 60 and Site Weld | Basement: Grids 1-4/ A-C
3. Engineer Inspection (HOLD POINT) |
4. Terminate and cut around pile caps | Basement: Grids 1-4/ A-C
5. Engineer Inspection (HOLD POINT) |
6. Site Inspection Remedials | Basement: Grids 1-4/ A-C
7. Reinspection (if required) |
8. Install Bentonite Protection Layer |
160. Site Concrete Ground Floor
May 09 2019
-
May 16 2019
Short term 5B rev 5
April 2019 Ground Floor Production Lane
1) Detail Dig | Basement: Grids 1-4/ A-C
2) Height Check (hold point) | Basement: Grids 1-4/ A-C
3) Box Slab Edges | Basement: Grids 1-4/ A-C
4) Pour Concrete | Basement: Grids 1-4/ A-C
5) Engineering Inspection (hold point) |
6) Remedial Repairs |
123
1
7) Engineering Inspection (hold point) |
Spare Work Package
-
1. Spare Task |
2. Spare Task |
WP - Membrane
-
Task name
Status
Task Assignment Owner
-
Target Start
-
Target Finish
-
Actual Start
-
Actual Finish
-
Shift Notes
Constraints